For Architects & Designers

Flood Risk & Drainage for Architects

Flood Risk Assessments, SuDS strategies and drainage design that slot into your projects — fast, fixed-fee, and written to get your clients' applications through first time.

✓
Fixed fee — no VAT
✓
3–5 working day delivery
✓
Ex-LLFA expertise
✓
Direct access to your consultant
✓
England & Wales

A Consultant Who Works to Your Drawings and Your Deadlines

Architects come to us because they want a flood risk and drainage consultant who is easy to work with: someone who reads the drawings properly, works from your CAD files, flags the design implications early — floor levels, thresholds, where the SuDS has to go — and delivers a planning-ready report without fuss. That is what we do, and because the work is done personally by the consultant you speak to, there's no hand-off and no chasing.

We cover the full range architects need: householder FRAs for extensions and outbuildings in Flood Zones 2 and 3, FRAs for new dwellings and conversions, surface water drainage strategies to the National SuDS Standards, and detailed drainage design when you get to technical approval. All at a fixed fee agreed up front, with no VAT to add, so you can quote your client with confidence.

Having reviewed applications from inside a Lead Local Flood Authority, we know what the council's drainage officer and the Environment Agency actually look for — which is why our reports are written to satisfy them first time, and why an objection is rare.

What You Get

✓ A fixed-fee quote within 24 hours of sending us the site and drawings

✓ Reports delivered in 3–5 working days — sooner on request

✓ We work from your DXF / DWG and return drainage layouts that fit your plans

✓ Early design advice: floor levels, flood doors, SuDS space, discharge points

✓ Reports written to the current NPPF (August 2026), EA standing advice and the LLFA's own standards

✓ Support after issue — we deal with any consultee queries directly

Get a Fixed-Fee Quote for Your Project
Drainage design that fits your layout · Photo: daveynin from United States (CC BY 2.0)
Drainage design that fits your layout · Photo: daveynin from United States (CC BY 2.0)

How We Help Architects

Whatever stage the project is at, we fit in around it.

Feasibility & pre-app

A quick site check and honest advice before you commit — is an FRA needed, what will the council ask for, where will the drainage go?

Planning submission

Planning-ready FRAs and drainage strategies, proportionate to the scheme, with the drawings and calculations the LLFA expects.

Condition discharge & detailed design

Detailed drainage design, SuDS maintenance plans and condition submissions once permission is granted — on your drawings, to your programme.

Repeat clients

Many architects send us every flood-affected project they have. Same consultant, same standard, every time — and a priority turnaround for regular practices.

Which Works Need a Permit — and Which Don't

The permitting system is tiered. Getting your activity into the right tier first is what saves the time and cost.

Not every activity near water needs a full permit. Under the Environmental Permitting Regulations, a flood risk activity is either excluded (no permission needed), exempt (allowed, but must be registered with the Environment Agency), or requires a full Flood Risk Activity Permit. We work out exactly where your proposal sits before any application is made — so you don't pay for a permit you don't need, or get caught out by one you do.

When a permit is needed

Broadly, for works in, over, under or within 8 metres of a main river (16 m for a tidal main river), within 8 metres of a flood defence, or within the floodplain of a main river — including bridges, culverts, outfalls, walls, buildings, bank and bed works, and temporary works.

Main river vs ordinary watercourse

A permit only applies to a designated main river. Works to an ordinary watercourse are consented by the Lead Local Flood Authority instead, through Ordinary Watercourse Consent — so the first step is always confirming which one you're dealing with on the EA's main river map.

What we prepare

Where a permit is required we prepare and submit the application — location and works plans, a method statement, and any hydraulic modelling or flood risk information the EA asks for — and manage the EA liaison through to determination.

Frequently Asked Questions

How quickly can you turn around an FRA for a planning submission?
Our standard is 3–5 working days from instruction and receipt of your drawings; faster where a deadline demands it. Send the site address and plans and we'll confirm the timescale with the quote.
What do you need from us?
The site address or plans, your proposed drawings (DXF/DWG ideally, PDF is fine), and the planning reference if there is one. We obtain the flood data from the Environment Agency ourselves.
Can you produce drainage drawings that fit our layout?
Yes — we work in CAD from your files and return drainage layouts, levels and details that sit correctly on your plans, rather than generic sketches you have to redraw.
Do you deal with the council if they raise a query?
Yes. We respond to LLFA and Environment Agency queries directly and revise the report if needed, so you're not stuck in the middle relaying technical questions.

Get a Free Quote

Free, no-obligation fixed-fee quote within 24 hours. All flood zones and LLFAs covered across England and Wales.

Get a Free Quote

Or contact us directly: 07826 705389  •